Continuity Planning When the Office Is No Longer the Recovery Site
Hybrid work moved continuity risk from the office to homes, identity systems and regional power grids. How to plan for it, with a first 30 days checklist.

Hybrid work moved continuity risk from the office to homes, identity systems and regional power grids. How to plan for it, with a first 30 days checklist.
DORA, the UK operational resilience rules and US interagency guidance compared side by side, plus what each one means for a mid-size continuity program.
A practical BIA method: scope by process, choose interviews or surveys, rate impact over time, derive MTPD, RTO and RPO, and keep the results current.